This statement is false. A project management method called a work breakdown structure (WBS) uses a step-by-step process to finish big projects with many of moving parts.
What is work breakdown structure ?In project management and systems engineering, a work-breakdown structure is a deliverable-focused division of a project into more manageable parts. A essential project deliverable that divides the team's work into digestible chunks is a work breakdown structure.The WBS's main objective is to plan the project's timetable. The length of each work is planned in relation to its necessary predecessors and subsequent tasks. The WBS then offers a comprehensive plan so the project manager may understand how the project should develop and effectively manage the workflow.Depending on the complexity of your projects, you can add extra levels to WBS charts, which typically contain three. Initiation, planning, execution, control, and closeout are the five project phases that branch from the primary deliverable at the top and serve as control accounts.To learn more about project management refer :
https://brainly.com/question/16927451
#SPJ4
vulnerability scans can check: a. unexpected long-running processes b. hidden network daemons c. unauthorized programs in system directories d. all of the above
Unauthorized programs can be checked in system folders using vulnerability scanning.
Describe programs.The program is a predetermined set of sequential activities that a computer is programmed to carry out. The program in the modern pc system John von Neumann described in 1945 contains a sequence of orders that the machine executes one at a time. The application is often stored in a location that the computer can access.
What types of computer programs are examples?Computer programs include MS Office, MS Spreadsheet, Adobe Photoshop, Browser, Chrome, etc. To create graphics & special effects for movies, computer applications are used. Medical exams such as ultrasound imaging, X-rays, and other procedures are carried out using computer programs.
To know more about programs visit:
https://brainly.com/question/14368396
#SPJ4
the array uservals is an integer array of size 3. why does the following program generate an error? flowchart has 2 variables (integer array(5) uservals, integer i) and 9 nodes. node 1 is the start node and points to node 2. node 2 code: uservals[0]
An array of integers is a sequence of integers in successive words of memory termed as integer Array .
What is an integer array?In order to hold several values in a single variable, arrays are utilized rather than declaring separate variables for each item. Put the array name and data type (such as int) in square brackets to create an array. The array's integer count is also stored in memory. The instruction specifies an array of numbers in assembly code. To initialize or instantiate an array as we define it—that is, to assign values as we create the array—we can use the shorthand syntax shown below: myArray int[] = 13-14-15; Alternately, you may create a data stream and return it to the array using the formula int[] intArray = IntStream.To learn more about integer Array refer:
https://brainly.com/question/29759568
#SPJ4
Which company provides a crowdsourcing platform for corporate research and development?
OA.
MTurk
OB.
WikiAnswers
O C.
MediaWiki
OD.
Innocentive
correct answer: D. innocentive
Answer: D
Explanation: innocentive
which products (of those we covered) allow you to build data pipelines using graphical user interface and no coding?
The product that allow you to build data pipelines using graphical user interface and no coding is IBM SPSS Modeler and Modeler Flows in Watson Studio. The correct option is d.
What is the graphical user interface?A mouse is used to interact with a graphics-based operating system interface, which uses menus and icons to govern user interaction. It is a user-friendly visual interface that enables any action to be taken by the user without the need for programming expertise.
The GUI, as seen in Windows, MacOS, or Android environments, allows commands to be communicated without the need for programming using mouse motions or gestures.
Therefore, the correct option is d. IBM SPSS Modeler and Modeler Flows in Watson Studio.
To learn more about the graphical user interface, refer to the link:
https://brainly.com/question/14758410
#SPJ1
The question is incomplete. Your most probably complete question is given below:
a. Only IBM SPSS Statistics
b. Only IBM SPSS Modeler
c. OpenScale
d. IBM SPSS Modeler and Modeler Flows in Watson Studio
e. All of the above
How does The Sims Freeplay appeal to their demographic? Find examples that link to their demographic and write some analysis about how and why their advert/example links to their demographic.
The Sims Freeplay has changed the audience demographics for gaming and brought the industry into the mainstream.
What is demographics?Statistics used to describe populations and their characteristics are called demographics. A population's characteristics, such as age, race, and sex, are studied through demographic analysis. Statistics expressing socioeconomic information, such as employment, education, income, marriage rates, birth and death rates, and more, are referred to as demographic data.
For a variety of purposes, including economic market research and policy development, governments, businesses, and non-governmental organizations use demographics to learn more about the characteristics of a population. For instance, a company that sells high-end RVs might want to reach people who are approaching or are already retired and increase the number of people who can afford their products.
Learn more about demographics
https://brainly.com/question/6623502
#SPJ1
which is the correct syntax for mapping drive letter w to a shared folder named accounting on the finance server
Answer:
net use W: \\Finance\Accounting
Explanation:
which group on the home tab contains the command to change the font color of text?
The group on the home tab that contains the command to change the font color of text is Font.
What is a font's color?A person may add colored text in a variety of colors, like red, orange, green, blue, indigo, and many others, by changing the font color. Its backdrop color can also be set simultaneously. Wikilinks can be colored in a different hue than blue if necessary in order to fit them into a background color scheme by changing the font color.
Therefore, in the case above, to access the Font dialog box, select Format > Font > Font. Choose a color by clicking the arrow next to Font color.
Learn more about home tab from
https://brainly.com/question/15714847
#SPJ1
Write a program that asks the user to enter a city name, and then prints Oh! CITY is a cool spot. Your program should repeat these steps until the user inputs Nope.
Answer:
city = input("Please enter a city name: (Nope to end) ")
while city != "Nope":
print("Oh!", city, "is a cool spot.")
city = input("Please enter a city name: (Nope to end) ")
which method is used to send a ping message specifying the source address for the ping? ssue the ping command from within interface configuration mode.
Issue the ping command without specifying a destination IP address.
Issue the ping command without extended commands.
Issue the ping command after shutting down un-needed interfaces.
A method that is used to send a ping message specifying the source address for the ping is B. Issue the ping command without extended commands.
To specify the source address for the ping message, you can use the "ping" command with the "source" option followed by the IP address of the source interface. For example:
ping destination_IP_address source source_IP_address
For example, to ping the IP address 10.0.0.1 from the source interface with IP address 192.168.1.1, you would issue the following command:
ping 10.0.0.1 source 192.168.1.1
Learn more about the ping message, here https://brainly.com/question/28545729
#SPJ4
what is a public key encryption technique based on elliptic curve theory that can be used to create faster, smaller, and more efficient cryptographic keys?
The elliptic curve theory-based ECC cryptography is a key-based approach for encrypting data that employs a public key encryption mechanism.
Elliptic curve encryption (ECC) – what is it?Elliptic curve cryptography (ECC), a method for public key encryption based on elliptic curve theory, can be used to generate cryptographic keys more quickly, more efficiently, and in smaller sizes.
Public key encryption: what is it?Asymmetric key encryption is another name for public key encryption. Asymmetric keys, as the name implies, consist of two separate keys that are utilised in public-key encryption. An encryption key is used for encryption, and a decryption key is used for decryption. No other key will be utilised once the key for encryption and decryption has been chosen.
To learn more about cryptography visit:
brainly.com/question/88001
#SPJ4
in healthcare, regulations often dictate that important systems remain unpatched to maintain compliance. which kind of vulnerability does this introduce? answer inherent vulnerabilities weak passwords misconfigurations application flaws
Application defects are problems with user authentication and authorization. The biggest risk to security in full development comes from these issues.
What does the term "vulnerability" mean?the attribute of being weak or an object that is weak: the capacity to be easily harmed, swayed, or attacked: A doctor who recognizes the patient's vulnerability is what you want. Attack planners took advantage of weak spots in the country's defenses.
Why is it so frightening to be exposed?Why do we worry about being exposed? We worry that if someone learns the truth about who we actually are, they won't accept us. In actuality, pretense frequently has the inverse result from what we intend, even if we may strive to appear flawless, powerful, or clever in order to communicate with others.
To know more about vulnerability visit:
https://brainly.com/question/15593733
#SPJ4
if all the data in a database is not physically located in one place, it would be a(n) blank database.
If all the data in a database is not physically located in one place, it would be option D. Distributed database.
What does it mean when data is stored in one place?Normalization is the process of rearranging data in a database to ensure that it satisfies two essential criteria: Data storage is centralized, therefore there is no redundant data.
A distributed database is one that is made up of two or more files that are spread across various sites, either on the same network or on distinct networks entirely. The database is divided into several physical locations for storage of different portions, and different database nodes are used for processing.
Therefore, one can say that Distributed databases provide for local autonomy and location transparency of the data. This means that even if applications might not be aware of the precise location of the data, each site is equipped with the tools necessary to manage local data, enforce security, monitor transactions, and recover from local site failures.
Learn more about Distributed database from
https://brainly.com/question/28271067
#SPJ1
See options below
A. individual. B. Web C. commercial. D. Distributed
14. the process of coordinating a program as it changes through construction (like keeping files and programs in different places) is called:
Any systems development project may have a programming component that takes up the most time and money. Nevertheless, it has the potential to be the component that is most understood, and as a result, presents the fewest issues of all system development aspects—except in exceptional cases.
What process coordinating a changes' construction?The requirement gathering and analysis step, according to little software development experts, is the most crucial phase of the SDLC. At this point, the project team starts to comprehend what the project's stakeholders are hoping for.
Therefore, Gorilla testing is necessary in software testing to verify each module's functionality individually. To put it another way, we can say that gorilla testing is crucial when a system module is repeatedly tested to ensure that it is operating as intended.
Learn more about program here:
https://brainly.com/question/3224396
#SPJ1
what can you do with the email function for a full-text article in databases such as academic search premier or proquest national newspapers core?
Create a citation that used the type of your choosing; Email the full article to yourself; Talk to your students and/or your teacher about the full-text article.
What do databases do?A collection is a group of content that has already been arranged in a way that makes it easy to update and manage. Data records or files containing information, including as cash sales, customer information, financial data, and product information, are often aggregated and stored in computer databases.
What benefits do databases offer?Database management solutions enable users to safely, efficiently, and swiftly transfer data within an organization. A database management system offers acess to more good information by responding effectively to database requests.
To know more about Database visit :
https://brainly.com/question/28391263
#SPJ4
which network device concentrates communications signals, accepts only basic commands, and provides statistics such as throughput measures and uptime percentages?
The active hub is a network device that concentrates communications signals, only responds to the most fundamental commands, and offers information like throughput rates and uptime percentages.
What do network devices refer to?An individual network component that participates at one or more protocol layers is referred to as a network device. End devices, routers, switches, DSUs, hubs, and NICs are included in this. It is possible to measure the characteristics of network devices.
What is the name of the network devices?Image showing what a network device is
Networking Hardware Networking hardware usually referred to as network devices, is the physical equipment that enables hardware on a computer network to connect and communicate with one another. As an illustration, consider a repeater, hub, bridge, switch, router, gateway, NIC, etc.
To know more about hardware visit:
https://brainly.com/question/15232088
#SPJ4
which of the following factors underlie the younger-age language-learning advantage? group of answer choices complete lateralization of the language function to the left hemisphere sensitivity to sound variations in languages not regularly heard neural networks becoming dedicated to processing native-language sounds an ability to hear sound variations across all languages
The advantage of acquiring a language at a younger age is because brain networks become specialized in processing sounds from the native tongue.
How does a child's development change as a result of acquiring a new language?A youngster will become more adept at acquiring new languages once they have studied and mastered one. Because they can detect linguistic norms and patterns, even when the vocabulary is different, language learners are able to transmit skills from one language to another.
Is learning a language a talent that every youngster ought to possess?The ability to acquire a language is not one that kids either have or don't. In reality, a variety of internal and environmental factors, ranging from the child's personality to the way language is taught at their school, affect how quickly youngsters pick up a new language.
To learn more about language visit:
brainly.com/question/2714657
#SPJ4
Which of the following describes a collection of networks that are connected together
in order to share data?
(1 point)
O World Wide Web
O ISP
O internet
O broadband
Answer: A
Explanation:
The Internet describes a collection of networks that are connected together in order to share data. Thus, the correct option for this question is C.
What is a Collection of connected networks?The resulting system of interconnected networks is often called internetwork. It is also simply known as the internet. It is a worldwide system of computer networks which is often a network of networks in which users at any one computer can if they have permission, get information from any other computer.
The Internet is a network of networks and has different types of internet. It consists of public, private, academic, business, and government networks of local to global scope, linked by a comprehensive arrangement of electronic, wireless, and optical networking technologies.
Therefore, the Internet describes a collection of networks that are connected together in order to share data. Thus, the correct option for this question is C.
To learn more about the Internet, refer to the link:
https://brainly.com/question/2780939
#SPJ2
you have already set up your web data stream and data is flowing into your analytics property from your website. you notice that enhanced measurement is enabled for the web data stream. what happens when this setting is enabled?
Without requiring you to update your website's code, more events are collected from it when this setting is enabled.
What are the characteristics of a Web data stream?A data stream is the flow of data to Analytics from a client interaction (such as an app or website). Either a confined stream or an unbounded stream can be used to process the data. The two steps of stream analytics, storage and processing, are carried out concurrently while streaming data is continually produced and examined.
Describe the data stream service.Data streaming is the act of sending a constant stream of data, often referred to as streams, to stream processing software, usually with the purpose of gaining insightful information. A data stream is made up of a number of data components arranged chronologically.
To know more about data safety visit
brainly.com/question/4413002
#SPJ4
1) in ip v4, does the router need to update the ip header checksum hop by hop? why? 2) is aloha good for heavy traffic or light traffic? 3) i took my laptop to willard building, and connected to the penn state wireless lan. what protocol did i use to get my ip address for this connection? 4) in ipv4, how many bits are used to represent the source ip address? what protocol is used to get the mac address of a node based on its ip address?
Version 4 of the Internet Protocol (IPv4) uses the Internet checksum, also known as the IPv4 header checksum, as a checksum to identify packet header damage.
Why does the IPv4 header contain a checksum field?Version 4 of the Internet Protocol (IPv4) uses the Internet checksum, also known as the IPv4 header checksum, as a checksum to identify packet header damage. It represents the 16-bit outcome of summing the header words and is carried in the IP packet header.At every stage of processing the internet header, this is recalculated and confirmed because some header fields (like time to live) vary. Therefore, before performing any action on a received packet, it is essential to check the IP header checksum at each entity of the network layer (layer 3).To learn more about Internet Protocol refer,
https://brainly.com/question/17820678
#SPJ4
Josh creates a query that uses an expression to calculate a summarized value. He wants to filter the results of the query using a specific date, so he types, "31-Oct-12" in the Criteria row of the Date column. Which best describes Josh’s error?
a. Filters cannot be created using specific dates, only date ranges.
b. A pound symbol must appear before 31 and after 12 in the date.
c. The date must be entered in the Total row of the Date column.
d. Dates cannot be entered using the day-month-year format.
Since Josh creates a query that uses an expression to calculate a summarized value. The option that best describes Josh’s error is option b. A pound symbol must appear before 31 and after 12 in the date.
What is the date command?The date and time are shown or set using the date command. When the system is being used by multiple users, pay attention: Do not change the date.
Note that It is possible that a date used as criterion in an Access query won't yield the outcomes you were hoping for. Hence Between the dates, the "And" operator is required by the requirements.
Therefore, To make things simpler, you can perform the same test by using "Between" with the dates and the "And" operator rather than the "greater than," "less than," or "equal to" signs, as follows: Between #1/1/2005# And #1/1/2010#
Learn more about query from
https://brainly.com/question/25266787
#SPJ1
Which part of a computer takes the text and pictures on your screen and prints them onto paper?
Answer: Graphic Card
Explanation: The graphic card takes the text and pictures on your screen and prints them onto paper.
collecting and analyzing information that offers multiple points of view on a topic is known as:_____.
Data collection is the process of gathering and examining information that presents several viewpoints on a subject.
What is Data collection?
The procedure of acquiring and examining precise data from numerous sources to identify trends, possibilities, and solutions to research problems. The process of acquiring and measuring data on certain variables in an established system is known as data collection or data gathering. Cross-sectional studies gather information from a large number of subjects at one time, whereas longitudinal studies gather information from the same subjects over time, frequently concentrating on a smaller group of people who share a characteristic. Both are beneficial for addressing various kinds of research problems.
To learn more about data gathering from given brainly.com/question/17538970
#SPJ4
It is mandatory to include a banner marking at the top of the page to alert the user that CUI is present.
a. true
b. false
The statement " It is mandatory to include a banner marking at the top of the page to alert the user that CUI is present " is false.
What is CUI?
Within the U.S. Federal government, controlled unclassified information falls under this category. In order to streamline the sharing and protection of information, President Obama's Executive Order 13556 established the CUI program.
Because there are fewer restrictions on CUI than on classified information, CUI is the easiest way for enemies to access information. Loss of aggregated CUI directly affects the lethality of our warfighters, making it one of the biggest threats to national security.
To learn more about CUI, use the link given
https://brainly.com/question/29620353
#SPJ4
The commands to save a file as a powerpoint show is located in which portion of backstage view?.
Answer:1. How to Save a PowerPoint Presentation?
Once you have saved a PowerPoint presentation, you can easily save it again with just one click. Furthermore, you can also save a PowerPoint presentation in other formats. However, the process of saving a PowerPoint presentation is slightly different on Windows and on Mac.
Let’s understand the process in further detail.
1a. Saving a PowerPoint Presentation on Windows
To save a PowerPoint Presentation on Windows PC, you can follow either of the 2 simple methods.
Method-1: Using the “Save” button on Quick Access Toolbar
In the Quick Access Toolbar located at the very top of the screen, click on the “Save” icon.
The “Save” icon is located on the left side in the Quick Access Toolbar and looks like a floppy disk. Clicking on the “Save” button will immediately save the PowerPoint presentation in its current location as a “.pptx” file.
If you have opened a new presentation and you are saving it for the first time, clicking on the “Save” button will open a new explorer window. Simply navigate to the folder where you wish to save the new presentation on your computer, and click on “Save“.
Method-2: Using the “File” tab
Another, more common method is to use the “File” tab in PowerPoint to save your PowerPoint presentation.
Here’s what you need to do –
Step 1 – Click on the “File” Tab
Another way to save a PowerPoint presentation is to use the “File” menu. You have to first click on the “File” tab located at the left corner of the menu ribbon at the top of the screen.
Step 2 – Click on the “Save” option
This will open the backstage view in PowerPoint. Now, click on the “Save” option from the sidebar on the left side of the screen. This will save the Microsoft PowerPoint as a “.pptx” file in the current location.
Subscribe to Art of Presentations!
Get updates on the latest posts and more from Art of Presentations straight to your inbox.
Your Email...
SUBSCRIBE
I consent to receiving emails and personalized ads.
1b. Saving a PowerPoint Presentation on Mac
On a Mac computer, you can use the “File” menu as well to save the PowerPoint presentation.
The first step is to click on the “File” menu in the menu bar located at the top of the screen (above the PowerPoint window). This will open a dropdown menu. Click on the “Save” option from the dropdown menu to save the presentation as a “.pptx” file which is the standard format for presentations.
1c. Shortcut Keys to Save a PowerPoint Presentation
Microsoft PowerPoint also allows you to save a presentation with keyboard shortcuts. All you have to do is press the “Ctrl+S” keys on your keyboard in an open PowerPoint file. This will save the PowerPoint presentation.
1d. Best Format to Save a PowerPoint Presentation?
PowerPoint allows you to save a presentation in various different file formats! For instance, you can use the .ppt format if you wish to open the presentation file using PowerPoint 2007 or earlier. You can use .ppsx to open presentation directly as a PowerPoint Show file that opens it in the presentation mode.
In fact, there are several other formats you can save a presentation in. We shall explore how to save a PowerPoint presentation in several different formats later in the article.
However, the best format to save a PowerPoint Presentation is a “.pptx” file. This type can support all the latest as well as the older features of the PowerPoint presentation.
If you will be opening the presentation using a different software other than Microsoft PowerPoint, “.odp” is the best format. For printing, make sure to save the PowerPoint presentation as a PDF. That said, .pptx file format can help serve these purposes too.
2. How to Save a PowerPoint Presentation as PDF
Saving a PowerPoint presentation in PDF format is the suitable method for printing out your presentation. To save the PowerPoint presentation as a PDF file, follow the 4 easy steps.
Step-1: Click on the “File” Tab
Explanation:
Please help with coding from a beginner's computer sci. class (Language=Java)
Assignment Details=
Create a class called Palindromes, which will determine if a user’s entry is a palindrome. A
palindrome is a word or phrase that reads the same backward or forwards. See the examples.
A Santa at NASA My gym taco cat kayak NOW I WON race car
Your program will ignore spaces and ignore cases when determining if a string is a palindrome.
Use the String method replace to remove the spaces. If it is a palindrome, the output
PALINDROME, or else output NOT PALINDROME.
Additional requirements:
Add an infinite loop with a sentinel-trigger break test (allowing them to input multiple
attempts). You may decide on its command word or exit condition.
As below, make sure a spacer line exists between each run of the program
Here are two sample runs of the program.
Enter a word or phrase: Noon
PALINDROME
Enter a word or phrase: bookkeeper
NOT PALINDROME
Answer:
Explanation:
import java.util.Scanner;
public class Palindromes {
public static void main(String[] args) {
Scanner input = new Scanner(System.in);
String word;
while (true) {
System.out.print("Enter a word or phrase: ");
word = input.nextLine();
if (word.equals("exit")) {
break;
}
String modifiedWord = word.replace(" ", "").toLowerCase();
if (modifiedWord.equals(new StringBuilder(modifiedWord).reverse().toString())) {
System.out.println("PALINDROME");
} else {
System.out.println("NOT PALINDROME");
}
System.out.println();
}
input.close();
}
}
wes is using usmt to migrate user profiles to newly purchased windows 10 computers in the organization. to begin the migration, he executes the scanstate.exe process on the source computers to collect user profile information. where is this information most likely to be stored?
Answer:
When using USMT (User State Migration Tool) to migrate user profiles, the scanstate.exe process is used to collect user profile information from the source computers. This information is most likely to be stored in a migration store, which is a location on the source computer where USMT stores the data that it collects.
The migration store can be specified by the user when the scanstate.exe process is run, or it can be set to a default location. The default location for the migration store is typically the local drive of the source computer.
Once the user profile information has been collected and stored in the migration store, it can be used to restore the user profiles to the target computers using the loadstate.exe process. The loadstate.exe process reads the data from the migration store and restores it to the target computers, allowing the user profiles to be transferred to the new Windows 10 computers.
Explanation:
you are planning a server virtualization implementation using hyper-v. your virtualization solution must meet the following requirements: both 32-bit and 64-bit operating systems will be installed as virtual machines. you need to install six virtual machines. all virtual machines must be able to communicate with each other. virtual machines should not be able to communicate with any other network devices. virtual machines should not be able to communicate with the management operating system. what should you do? answer create a private network create an external network create an internal network create a wireless network
The virtualization solution with that requirements is to create a private network.
What is private network?Hyper-V only have three type of virtualization network which is external, internal, and private.
External network will allow virtual machines to communicate with each other in the same host or different host or external network, also it can communicate with the host.
Internal network will allow virtual machine to communicate with each other in the same host and with the host.
Private network will allow virtual machine to communicate only with each other in the same host, communication with the host is inaccessible.
Since, the requirement is can communicate with each other, can't communicate with other network, and can't communicate with the management which is a host. So, the private network is the solution.
Learn more about Hyper-V here:
brainly.com/question/28871585
#SPJ4
Under what tab In PowerPoint will you find the "Add New Slide" button?
Home
Insert
Slide show
Delete
Answer:
Home
Explanation:
It is just under the home tab.
In right side of copy paste icon
What is the name of the small square in the bottom right-hand corner of a selected cell or range called?
Fill Handle.
Explanation:What is a full handle?Fill Handle: The fill handle is the small bold square in the bottom right corner of a cell that can be used to copy (fill) data to adjacent cells in the same row or column.
I hope my answer helped you! If you need more information or help, comment down below and I will be sure to respond if I am online. Have a wonderful rest of your day!
In Scratch, what is located in the bottom right section of the screen?
A.
code blocks
B.
editor
C.
run/test window
D.
sprite library
Answer: C
Explanation: