Answer:
what is the question please tell me on comment
If f(x)=3x-2 and g(x)=2x+1, find (f+g)(x)
A. 5x - 3
B. x - 3
C. x - 1
D. 5x - 1
brainliest for help!!
Answer:
D. 5x - 1
Step-by-step explanation:
To solve this, you need to add together f(x) and g(x)
f(x) + g(x) = (3x - 2) + (2x + 1)
3x + 2x = 5x
-2 + 1 = -1
The answer is 5x - 1
Keisha and Jen went out to eat for dinner their meal together were $45.76 they want to leave a 20% tip how much total
Answer:
I'm only guessing its $25.76 but just to classify you should probably ask
Compare the decimal numbers 0.218 and 0.128.
0.128 = 0.218
0.218 < 0.128
0.128 > 0.218
0.218 > 0.128
Easy Help 5th grade math will mark as brainlist
Answer
0.128>0.218 ,0.218>0.128, 0.128<0.218, 0.218>0.128
Step-by-step explanation:
0.218 is bigger because its 0.218 is a bigger number than 0.1288.4y - 6.8 = - 3.2y + 16.4
Answer:
y = 2
Step-by-step explanation:
Q: What is the product of (a-5) and (a+3)?
[tex]▪▪▪▪▪▪▪▪▪▪▪▪▪ {\huge\mathfrak{Answer}}▪▪▪▪▪▪▪▪▪▪▪▪▪▪[/tex]
Let's solve for a :
[tex](a - 5) \times (a + 3)[/tex][tex](a \times a) + (a \times 3) + ( - 5 \times a) + ( - 5 \times 3)[/tex][tex] {a}^{2} + 3a - 5a - 15[/tex]In a distribution with a mean of 100 and a standard deviation of 15, the probability that a score
will be 115 or higher is _____ Please show all your work.
Using the Zscore principle, the probability of obtaining a score which will be 115 or higher is 0.15866
Given the Parameters :
Mean, μ = 100Standard deviation, σ = 15 Score, X ≥ 115Zscore = (X - μ) ÷ σ
Zscore = (115 - 100) ÷ 15
Zscore = 1
Using a normal distribution probability ;
P(Z ≥ 1) = 1 - P(Z ≤ 1)
P(Z ≥ 1) = 1 - 0.84134
P(Z ≥ 1) = 0.15866
Therefore, the probability is 0.15866
Learn more :https://brainly.com/question/8165716
Pls answer the question in the photo
Answer:
correct answer to the problem is x= -9
Joe answered correctly.
Answer: nick
Step-by-step explanation: subtract 6 from both sides to get 0 on one side and then divide both sides by 2 to get x on its own
Factor.
3x(y−4)−2(y−4)
Enter your answer in the box.
Answer: Use the distributive property to multiply 3 by y−4.
3y−12−2(y−4)
Use the distributive property to multiply −2 by y−4.
3y−12−2y+8
Combine 3y and −2y to get y.
y−12+8
Add −12 and 8 to get −4.
Anwser:
y−4
Step-by-step explanation:
Hope this helps!
‼️PLEASE HELP I HAVE NO IDEA ON HOW TO DO THIS‼️‼️
Solve each system by elimination. Please show the work.
1. 3x+3y+6z=9; 2x+y+3z=7; x+2y-z=-10
2. 3x-y+z=3; x+y+2z=4; x+2y+z=4
3. x-2y+3z=12; 2x-y-2z=5; 2x+2y-z=4
Answer:
under what topic is this?
help please i will give brainliest ^^;;
Answer:
The slope for number 4 is 5/-4 and for number 6 is 4/1
Step-by-step explanation:
5/-4: slope is rise over run so you have to go up (positive) 5 and you have to go to the left (negative) so its 5/-4
4/1: again it's rise over run so you have to go up (positive) 4 and right one (positive)
Answer:
hello
are you army
who is your bias
it’s for i ready. please help
Answer:
6, 12, 18, 24, 30, 36, 42, 48, 54 (the bolded numbers go in the box)
Step-by-step explanation:
1. To find the multiples of 6 between 6 and 54, we have to multiply 6 by numbers from 1 to 9.
6 × 1 = 66 × 2 = 126 × 3 = 186 × 4 = 246 × 5 = 30 6 × 6 = 36 6 × 7 = 426 × 8 = 48 6 × 9 = 54Therefore, the multiples of 6 between 6 and 54 are 6, 12, 18, 24, 30, 36, 42, 48, 54. (again, the bolded numbers go in the boxes)
YO I NEED HELP
A forest owned by the Jumbo Lumber Corporation contains 4,498 trees. If Jumbo Lumber cuts down 57 trees every day, which function can be used to find the number of trees, n, left in the forest after t days?
A.
n(t) = (4,498-57)t
B.
n(t) = 4,498 + 57t
C.
n(t) = 4,498t - 57
D.
n(t) = 4,498 - 57t
Answer:
D
Step-by-step explanation:
Edmentum:))
Which raito is less than 7/15?
A. 9/15
B. 2/5
C. 3/5
D. 24/45
Answer:
⅖
Step-by-step explanation:
Simply convert them to decimals...
7/15=0.466666...
9/15=0.6
⅖=0.4
⅗=0.6
24/45=0.53333...
Hope this helps.
in a set of 5 numbers the average of two is 12 the average of the other 3 is 7 what is the average of all five numbers. (fraction or whole number)
Answer:
The average of all 5 numbers is 9
Step-by-step explanation:
Two of the numbers average 12. That means that their total is 2*12 = 24
Three of the other numbers average 7. That means that their total is 7*3 = 21
The total score for the 5 numbers is 24 + 21 = 45
The average for all 5 numbers is 45/5 = 9
Solve the for variable
c+7=13
c = ?
Answer:
c=6
Step-by-step explanation:
c+7=13
-7 -7
c=13-7
c=6
The function g(x) is a transformation of the cube root parent function, f(x) = 3vx
What function is g(x)?
Answer:
C. g(x)=3√x+4+3
Step-by-step explanation:
g(x) shift left 4, shift up 3, with no compression or stretch.
a=1
h=-4
k=3
The function f(x) after the transformation can be written as -
g(x) = [tex]$\sqrt[3]{x-4} +3[/tex]
What is function?A function is a relation between a dependent and independent variable. We can write the examples of function as -
y = f(x) = ax + b
y = f(x, y, z) = ax + by + cz
Given is that function g(x) is a transformation of the cube root parent function f(x) = [tex]$\sqrt[3]{x}[/tex].
The function f(x) is shifted up by three units and left by 4 units. So, we can write the rule for the function transformation as -
g(x) = [tex]$\sqrt[3]{x-4} +3[/tex]
Therefore, the function f(x) after the transformation can be written as -
g(x) = [tex]$\sqrt[3]{x-4} +3[/tex]
To solve more questions on functions, visit the link below-
https://brainly.com/question/30194223
#SPJ7
Someone help plz tyyyy!
Answer:
When y=7,9 the answer is yes when it = -10,-8 the answer is no.
Step-by-step explanation:
Simple substitution gets us the resulting values. for y=7 we get [tex]15\geq 15[/tex] which is true. For y=9 we get [tex]19\geq 15[/tex] which is also true. For the other values we get a negative number which is not a solution.
I have more questions to due after this
Answer:
a reflection over the line y=-x
Step-by-step explanation:
It took 35 seconds for 5 songs to download to Rebecca’s computer. The next day, it took 42 seconds for 6 songs to download. Write an equation in point-slope form to represent the time y it took to download x songs.
NEEDS TO BE STEP BY STEP
The equation in point-slope form to represent the time y it took to download x songs is; (y - 35) = 7(x - 5)
Since it took 35 seconds for 5 songs to downloadand it took 42 seconds for 6 songs to downloadIn essence, we can represent the information as;
(5, 35) and (6,42)To find the slope of the equation; we have;
Slope, m = (42-35)/(6-5)m = 7In essence, the equation in point-slope form to represent the time y it took to download x songs is;
(y - 35) = 7(x - 5)Read more:
https://brainly.com/question/6497976
Find the indicated values by using the graph.
1. h(2)=_____
2. h(4)=_____
3. h(1)=_____
4. h(5)=_____
5. h(____)=4
6. h(____)=1
7. What are the values for h(____)=2?
What is 32008 rounded to the nearest highest place value
Moon Company produces baseball bats and cricket paddles. It has two departments that process all products – Cutting Department and Finishing Department.
In Finishing Department, direct materials (DM) are added at the start of the process and conversion costs (CC) are added evenly during the process. Company is using Weighted Average method for the Finishing Department.
During July, beginning work in process in the Finishing Department was 80% complete as to conversion. Beginning inventories included $30,800 for transferred-in costs, $13,200 for direct materials, and $27,500 for conversion costs. Ending inventory was 30% complete as to CC. Additional information about the Finishing Department follows:
Finishing
Beginning work-in-process units
26,400
Units transferred in this period
74,800
Units completed & transferred out
79,200
Ending work-in-process units
22,000
Material costs added
$37,400
Conversion costs
$75,460
Transferred-in costs
$141,240
What is equivalent units for transferred-in cost, direct materials, and conversion cost, respectively? Separate with slash /.
Moon Company produces baseball bats and cricket paddles. It has two departments that process all products – Cutting Department and Finishing Department.
In Finishing Department, direct materials (DM) are added at the start of the process and conversion costs (CC) are added evenly during the process. Company is using Weighted Average method for the Finishing Department.
During July, beginning work in process in the Finishing Department was 80% complete as to conversion. Beginning inventories included $30,800 for transferred-in costs, $13,200 for direct materials, and $27,500 for conversion costs. Ending inventory was 30% complete as to CC. Additional information about the Finishing Department follows:
Finishing
Beginning work-in-process units
26,400
Units transferred in this period
74,800
Units completed & transferred out
79,200
Ending work-in-process units
22,000
Material costs added
$37,400
Conversion costs
$75,460
Transferred-in costs
$141,240
What is equivalent units for transferred-in cost, direct materials, and conversion cost, respectively? Separate with slash /.
Moon Company produces baseball bats and cricket paddles. It has two departments that process all products – Cutting Department and Finishing Department.
In Finishing Department, direct materials (DM) are added at the start of the process and conversion costs (CC) are added evenly during the process. Company is using Weighted Average method for the Finishing Department.
During July, beginning work in process in the Finishing Department was 80% complete as to conversion. Beginning inventories included $30,800 for transferred-in costs, $13,200 for direct materials, and $27,500 for conversion costs. Ending inventory was 30% complete as to CC. Additional information about the Finishing Department follows:
Finishing
Beginning work-in-process units
26,400
Units transferred in this period
74,800
Units completed & transferred out
79,200
Ending work-in-process units
22,000
Material costs added
$37,400
Conversion costs
$75,460
Transferred-in costs
$141,240
What is equivalent units for transferred-in cost, direct materials, and conversion cost, respectively? Separate with slash /.
Moon Company produces baseball bats and cricket paddles. It has two departments that process all products – Cutting Department and Finishing Department.
In Finishing Department, direct materials (DM) are added at the start of the process and conversion costs (CC) are added evenly during the process. Company is using Weighted Average method for the Finishing Department.
During July, beginning work in process in the Finishing Department was 80% complete as to conversion. Beginning inventories included $30,800 for transferred-in costs, $13,200 for direct materials, and $27,500 for conversion costs. Ending inventory was 30% complete as to CC. Additional information about the Finishing Department follows:
Finishing
Beginning work-in-process units
26,400
Units transferred in this period
74,800
Units completed & transferred out
79,200
Ending work-in-process units
22,000
Material costs added
$37,400
Conversion costs
$75,460
Transferred-in costs
$141,240
What is equivalent units for transferred-in cost, direct materials, and conversion cost, respectively? Separate with slash /.
The Moon Company's equivalents units for transferred-in cost, direct materials, and conversion cost are 74,800 / 101,200 / 86,800 respectively.
Data and Calculations:
Percentage of completion:
Beginning work in process = 80%
Ending work in process = 30%
Beginning inventories:
Transferred-in costs = $30,800
Direct materials costs = $13,200
Conversion costs = $27,500
Physical Flows of Units:
Beginning WIP = 26,400
Units transferred in from Cutting Department = 74,800
Total production units available = 101,200 (26,400 + 74,800)
Units completed and transferred out = 79,200
Ending WIP = 22,000
Transferred-in Direct Materials Conversion
Units transferred out 79,200 79,200
(79,200 x 100%)
Units transferred-in 74,800 0 0
(74,800 x 100%)
Ending WIP 0 22,000 (100%) 6,600 (22,000 x 30%)
Total equivalent units 74,800 101,200 86,800
Thus, the equivalent units for the Finishing Department are determined based on the percentage of completion under the Weighted Average Method.
Learn more: https://brainly.com/question/17078653
The hourly rate for a lecturer is £17.50. She works 35 hours a week and 8 hours overtime at time-and-a-half. What is her total pay for the week?
Check all solutions to the equation. If there are no solutions, check "None."
x = 16
Someone please help!!
Answer:
Its E
Step-by-step explanation:
SOLVE THIS AND EXPLAIN STEP BY STEP PLEASE!!!!
Answer:0=0
Step-by-step explanation:2(4x + 3) = 17x+3-9x +3 1st we will distribute. 2 times 4x gives you 8x and 2 times 3 gives you 6. Now the equation is 8x + 6 = 17x+3-9x+3.Now we're gonna add 3 + 3 gives you 6. Now the equation is 8x +6 = 17x+6-9x Now we're gonna combine like terms. So now we'll put together 17x - 9x which give you 8x. Now the equation is 8x +6 = 8x +6. Now where gonna subtract 6 from both sides. 8x = 8x and if I simplify it we'll get 0=0 which is the final answer
Steffan cycled 10km in 45 minutes. He rested for
20 minutes then cycled a further 8 km in 40 minutes.
Work out his average speed for the whole journey.M
Give your answer correct to one decimal place.
Math
Answer: If you measure out a 10k course and then time how long it takes you to ride it, that will tell you which speed range to use and what time to input. If you weigh 185 pounds and fall into the 12 to 13 mph range, it will take you about 30 minutes to pedal 10k — which means that according to the ACE estimates, you will burn about 335 calories.
Step-by-step explanation:
Hope this helps!
Answer:
0.2km/min or 12.7km/hour
Step-by-step explanation:
speed = distance ÷ time
speed = (10km + 8km) ÷ (45 mins + 40 mins)
= 18 ÷ 85
= 0.21176...km/min ≈ 0.2km/min
To convert 0.21176...km/min into km/hr, you multiply by 60
0.21176...km/min × 60 = 12.70588...km/hr ≈ 12.7km/hr
Can yall please help me with this I am helping my brother I just need the answers lol.
Answer:
hope it helps
Step-by-step explanation:
4. 1/3
5. 1/3
6. 3/4
7. 1/4
8. 1/2
9. 3/7
10. 2/7
11. 3/5
12. 2/3
A cube shaped block of ice has a mass of 59 kg. The density of ice is 917 kg per cubic meter. The mass of an object is the product of its density and its volume. Write a cubic function to model the mass of a block of ice in terms of its edge length x (in meters).
Using the density formula, the cubic function that models the mass of of a block of ice in terms of its edge length x is:
m = 917x³.
Using the function, the edge length of the block of ice is of 0.4 m.
What is the formula for the density of an object?The density of an object is given by the mass of the object divided by it's volume, as follows:
d = m/v.
Hence the mass of the object is given by the following equation:
m = dv.
For this problem, we have that:
The density of ice is 917 kg per cubic meter, hence d = 917.The block of ice has a cubic format, meaning that v = x³, in which x is the edge length.Hence the cubic function that models the mass of of a block of ice in terms of its edge length x is:
m = 917x³.
Considering the mass of the block of ice, the length is found as follows:
59 = 917x³
x = cubic root(59/917) -> (59/917)^(1/3) in any calculator
x = 0.4 m.
Using the function, the edge length of the block of ice is of 0.4 m.
More can be learned about the density formula at https://brainly.com/question/11836799
#SPJ1
b) Raj bought $3.63 worth of raisins.
What was the mass in grams? Give two
possible answers.
Answer:
how much is 1 gram of raisins worth in money
Step-by-step explanation:
Answer:
How much of 1 gram of raisin was worth in money
Multiply 3hrs 30mins by 4
Answer:
14 hours
Step-by-step explanation: