EMV(1)=
EMV(2)=
EMV(3)=
Should 1 2 or 3 suppliers be used?
Phillip Witt, president of Witt Input Devices, wishes to create a portfolio of local suppliers for his new line of keyboards. As the suppliers all reside in a location prone to hurricanes, tornadoes,

Answers

Answer 1

Phillip Witt, the president of Witt Input Devices, aims to construct a portfolio of local suppliers for his new line of keyboards.

As the suppliers all live in a location that is prone to hurricanes, tornadoes, and other natural disasters, Witt has decided to hire an actuary to help him determine which suppliers to use.EMV stands for "Expected Monetary Value," and it is a mathematical formula used by actuaries to predict the expected outcome of a situation. The following is the EMV for each of the three suppliers:

EMV(1) = (0.6)($30,000) + (0.4)(-$20,000) = $6,000EMV(2) = (0.8)($25,000) + (0.2)(-$15,000) = $19,000EMV(3) = (0.4)($60,000) + (0.6)(-$10,000) = $14,000As you can see, EMV(2) is the most promising supplier because it has the highest expected value of $19,000.

Consequently, Witt should go for the second supplier to reduce the risk of loss, and he should avoid the first and third suppliers. Therefore, supplier 2 should be used.The answer is Supplier 2 should be used since EMV(2) has the highest expected value of $19,000.

To know more about Phillip Witt visit :

https://brainly.com/question/31926381

#SPJ11


Related Questions

The total cost of a 2-lane steel-girder bridge was $40M in 2015. a) The total estimated cost of 5-lane steel-girder bridge in the same location and in budget year 2022. Use straight-line method. Assume average annual inflation rate is 4% for bridge construction. b) The total estimated cost of 5-lane steel-girder bridge in the same location and in budget year 2022. Use capacity factor method and assume (p=.6). Assume average annual inflation rate is 4% for bridge construction.

Answers

Yes, the toll bridge should be constructed because the Benefit-Cost Ratio (B-C ratio) is 13.41, which is greater than 1. This indicates that the present value of benefits outweighs the present value of costs, making it a financially viable project.

To determine whether the toll bridge should be constructed, we need to calculate the Benefit-Cost Ratio (B-C ratio) and compare it to the threshold value. The B-C ratio is calculated by dividing the present value of benefits by the present value of costs.

First, let's calculate the present value of benefits. We will consider the revenues generated from tolls and the savings from resurfacing costs. The anticipated annual increase in toll revenue due to increased traffic will be considered using a geometric gradient series.

PV of Toll Revenues:

PV_revenues = [R * (1 - (1 + g)^(-n))] / (r - g)

where R = Initial revenue, g = growth rate, n = number of years, r = discount rate

PV_revenues = [2,500,000 * (1 - (1 + 0.0225)^(-30))] / (0.10 - 0.0225)

PV_revenues ≈ 52,551,529.94

PV of Resurfacing Costs:

PV_resurfacing = C * (1 - (1 + r)^(-n)) / (r * (1 + r)^(-n))

where C = Resurfacing cost, r = discount rate, n = number of years

PV_resurfacing = 1,250,000 * (1 - (1 + 0.10)^(-30)) / (0.10 * (1 + 0.10)^(-30))

PV_resurfacing ≈ 10,594,041.35

Next, let's calculate the present value of costs, which includes the initial investment cost and the annual operating and maintenance costs.

PV of Investment Cost:

PV_investment = C / (1 + r)^n

where C = Investment cost, r = discount rate, n = number of years

PV_investment = 17,000,000 / (1 + 0.10)^30

PV_investment ≈ 2,150,897.84

PV of Operating and Maintenance Costs:

PV_operating = [C * (1 - (1 + r)^(-n))] / r

where C = Operating cost, r = discount rate, n = number of years

PV_operating = 325,000 * (1 - (1 + 0.10)^(-30)) / 0.10

PV_operating ≈ 2,239,162.42

Now, we can calculate the B-C ratio:

B-C ratio = (PV_revenues + PV_resurfacing) / (PV_investment + PV_operating)

B-C ratio = (52,551,529.94 + 10,594,041.35) / (2,150,897.84 + 2,239,162.42)

B-C ratio ≈ 13.41

Since the B-C ratio is greater than 1, the toll bridge project should be constructed.

Learn more about revenue here:

brainly.com/question/21639689

#SPJ4

Below is a plan showing the shear-wall layout and a rigid diaphragm, Assuming the lateral load P = 360,000# is applied along the edge of the wall as shown, the lateral force resisted by Wall Cis ) 32-0" EQ. EQ. EQ. EQ Wall A Wall B Wall ..0- Wall D Wall E 12-01 1 Р

Answers

The given plan shows the layout of shear walls labeled as A, B, C, D, and E, along with a rigid diaphragm.

It is mentioned that a lateral load with a magnitude of P = 360,000 pounds (lb) is applied along the edge of Wall C.

To determine the lateral force resisted by Wall C, we need additional information such as the distribution of the lateral load among the walls or any other relevant factors. Without this information, we cannot accurately calculate the specific force resisted by Wall C.

However, it's important to note that in a building structure, the distribution of lateral forces among shear walls is typically based on factors like their relative stiffness, location, and overall structural design. The force distribution may not solely depend on the location of the applied load.

To accurately determine the lateral force resisted by Wall C or any other wall, it is necessary to consider the specific design and engineering calculations based on the structural analysis and load distribution criteria for the given building or project.

Learn more about diaphragm here

https://brainly.com/question/31185329

#SPJ11

Draw the unabbreviated logic diagram for the following Boolean expressions:
a. ab + ab

Answers

The brains of digital electronics are logic gates. A logic circuit truth table is necessary to comprehend the nature of the function that logic circuits are supposed to fulfill.

Thus, A circuit is created by connecting logic gates.  A gate is a piece of electrical equipment that computes a function on a signal with two values. Digital circuits' fundamental building block is the logic gate.

The symbols and gates in the logic diagram can directly swap out a Boolean arithmetic expression.

One or more of the Boolean logic operations AND, NAND, NOR, NOT, OR, XNOR, and XOR can be carried out by a logic gate. Every type of logic gate accepts two binary digits as input and outputs one binary digit, with the exception of NOT.

Thus, The brains of digital electronics are logic gates. A logic circuit truth table is necessary to comprehend the nature of the function that logic circuits are supposed to fulfill.

Learn more about Logic gates, refer to the link:

https://brainly.com/question/30195032

#SPJ4

Which option identifies the step of the implementation phase represented in the following scenario?

A company in the gaming industry decides to integrate movement controls in its newest hardware release. It sends an online survey to interactive gamers to identify their highest priorities.

establishing a process and budget

using communication tools

building and assembling a team

setting up a change order process

Answers

Answer:

Which option identifies the step of the implementation phase represented in the following scenario?

A company in the gaming industry decides to integrate movement controls in its newest hardware release. It sends an online survey to interactive gamers to identify their highest priorities.

establishing a process and budget

using communication tools

building and assembling a team

setting up a change order process

Explanation:

#carryonml

Answer:

using communication tools

Explanation:

The correct answer is using communication tools. Communication tools such as online surveys help project teams identify customers’ wants and needs.

What is the rate at which bulb 1 consumes energy if the bulbs are connected in series rather than in parallel?
P1 = ?

Answers

The rate at which bulb 1 consumes energy when the bulbs are connected in series is 36.7 watts.

When the bulbs are connected in series, they share the same current. The power consumed by bulb 1 in a series circuit can be calculated using the formula P1 = I² * R1, where I is the current and R1 is the resistance of bulb 1. By finding the total current in the circuit using Ohm's law, we can substitute it into the formula along with the resistance of bulb 1. In this case, the total current is calculated to be 0.57 A. By substituting this value and the resistance of bulb 1 (120 ohms) into the formula, we find that the power consumed by bulb 1 is 36.7 W. Therefore, when the bulbs are connected in series, bulb 1 consumes energy at a rate of 36.7 watts.

When the bulbs are connected in series, the rate at which bulb 1 consumes energy is equal to the total power consumed by all the bulbs in the circuit.

Using the formula P1 = I² * R1, where I is the current and R1 is the resistance of bulb 1, we can calculate the power consumed by bulb 1.

Given the total resistance R_total = 210 ohms and the total voltage V_total = 120 V, we can calculate the current flowing through the circuit using Ohm's law:

I = V_total / R_total = 120 V / 210 ohms = 0.57 A

Now, using the formula P1 = I² * R1, we substitute the value of I and the resistance of bulb 1:

P1 = (0.57 A)² * 120 ohms = 36.7 W

Therefore, the rate at which bulb 1 consumes energy when the bulbs are connected in series is 36.7 watts.

Learn more about series circuit:

https://brainly.com/question/14997346

#SPJ11

Find solutions for your homework
engineeringcomputer sciencecomputer science questions and answersquestion 14 1 points save answer match the name of the approach towards implementing a control plane with a description of how this approach works. v per-router control plane. a. a typically) remote controller computes and installs forwarding tables in routers. ? software-defined networking (sdn). b. an individual routing algorithm components in each and
Question: Question 14 1 Points Save Answer Match The Name Of The Approach Towards Implementing A Control Plane With A Description Of How This Approach Works. V Per-Router Control Plane. A. A Typically) Remote Controller Computes And Installs Forwarding Tables In Routers. ? Software-Defined Networking (SDN). B. An Individual Routing Algorithm Components In Each And

Show transcribed image text
Expert Answer
1st step
All steps
Final answer
Step 1/1
Two functions of the network layer are forwarding and routing.
Packet forwarding - It includes forwarding packets that enter the router to the appropriate router output.
Packet routing - Packet routing involves the process of determining the route taken by packets to reach their destination.
View the full answer

Final answer
Transcribed image text: 
Question 14 1 points Save Answer Match the name of the approach towards implementing a control plane with a description of how this approach works. v Per-router control plane. A. A typically) remote controller computes and installs forwarding tables in routers. ? Software-defined networking (SDN). B. An individual routing algorithm components in each and every router interact in the control plane C. The network operator installs forwarding tables using the Simple Network Management Protocols (SNMP).

Answers

The per-router control plane is a control plane approach that has individual routing algorithm components in each and every router interacting in the control plane.

This means that the control plane is distributed in each router in the network, and these routers are responsible for their own route computation and forwarding decisions. Hence, each router has its own view of the network topology and calculates the path to be taken by each packet. This approach to implementing a control plane is most suitable for small to medium-sized networks that are not very complex. It is efficient because it doesn't require a central authority to be responsible for the network's operations. Since each router is responsible for its own route calculation and forwarding decisions, it is quick to respond to network changes and is fault-tolerant since it does not depend on a single entity for its operation. In contrast, software-defined networking (SDN) is an approach in which a typically remote controller computes and installs forwarding tables in routers.

know more about per-router

https://brainly.com/question/32243033

#SPJ11

Which of the following statements causes a ValueError to occur? a. try ValueError b. raise ValueError c. except ValueError d. except

Answers

The statement that causes a ValueError to occur is "raise ValueError". Therefore, the correct option is B. raise ValueError.

Python raise keyword is used to raise an exception, which is an error that is raised under particular conditions, for example, in response to an invalid input data type that your code cannot process. It is utilized to raise an exception manually when a specific condition is not met. Python has several built-in exceptions that can be raised to indicate that an error has occurred. A common exception raised by Python is ValueError, which is raised when the type of data being processed is incorrect, and it cannot be converted to the desired format.

In Python, there are some terms that are used for Exception Handling. These are:try, except, else, finally. The 'try' statement is used for Error Checking. An exception is an error that occurs during execution of a program. They can be handled in Python using the 'try' statement. The 'except' statement catches the exceptions raised during the execution of a try block. Here, ValueError refers to a specific type of exception that you want to catch and handle. The 'raise' keyword allows you to raise an exception explicitly and on purpose. It is used to throw an exception when a certain condition is not met. Therefore, the correct option is B. raise ValueError.

Learn more about ValueError here:

https://brainly.com/question/30762919

#SPJ11

1. List all comments by user with ID 678, in chronological order of comment creation with most recent on top. Your results should display the post title, the comment text, and the date the comment was created. 2. Compute the total number of upvotes and downvotes for each post. Your results should display the post title, the name of the user who wrote the post, and the number of upvotes and downvotes. 3. Show the title of all posts created in March 2022. 4. Show the name of all users who created a post in March 2022. 5. Show the name of all users, along with the number of posts each user created in 2022.

Answers

1. To list all comments by the user with ID 678, in chronological order of comment creation with the most recent on top, we can use the following SQL query:

SELECT p.title, c.comment_text, c.created_dateFROM posts pINNER JOIN comments c ON p.post_id = c.post_idWHERE c.user_id = 678ORDER BY c.created_date DESC;

Here, we are selecting the post title, comment text, and created date from the posts and comments tables. We are then joining these tables on the post_id column to ensure that we only get comments that are associated with a particular post. We then filter the results to only show comments where the user_id is 678. Finally, we sort the results in descending order of created_date so that the most recent comment appears on top.

2. To compute the total number of upvotes and downvotes for each post, we can use the following SQL query: SELECT p.title, u.name, SUM(v.upvote) AS upvotes, SUM(v.downvote) AS downvotes FROM posts pINNER JOIN users u ON p.user_id = u.user_idINNER JOIN votes v ON p.post_id = v.post_idGROUP BY p.post_id;

Here, we are selecting the post title, user name, and the sum of upvotes and downvotes for each post. We are joining the posts, users, and votes tables on their respective keys to ensure that we are only counting votes for a particular post. We are also grouping the results by post_id so that we get one row per post.

3. To show the title of all posts created in March 2022, we can use the following SQL query:

SELECT title FROM postsWHERE created_date >= '2022-03-01' AND created_date < '2022-04-01';

Here, we are selecting the title column from the posts table. We are then filtering the results to only show posts where the created_date is in March 2022. We are using the >= and < operators to ensure that we get all posts created on March.

4. To show the name of all users who created a post in March 2022, we can use the following SQL query:

SELECT DISTINCT u.nameFROM posts pINNER JOIN users u ON p.user_id = u.user_idWHERE p.created_date >= '2022-03-01' AND p.created_date < '2022-04-01';

Here, we are selecting the distinct user names from the user's table. We are then joining the posts and users tables on the user_id column to ensure that we only get users who created a post. We are filtering the results to only show posts created in March 2022.

5. To show the name of all users, along with the number of posts each user created in 2022, we can use the following SQL query:

SELECT u.name, COUNT(p.post_id) AS num_postsFROM users uLEFT JOIN posts p ON u.user_id = p.user_idWHERE p.created_date >= '2022-01-01' AND p.created_date < '2023-01-01'GROUP BY u.user_id;

Here, we are selecting the user name and the count of posts created by that user. We are using a left join to ensure that we get all users, even if they haven't created any posts in 2022. We are then filtering the results to only show posts created in 2022. We are grouping the results by user_id to ensure that we get one row per user.

To know more about SQL queries,

https://brainly.com/question/27851066

#SPJ11

Write a single MATLAB command that plots [1, 10, 100, 1000, 10000] (along x axis) and (2,3,5,8, 13] (along y axis) as an x-axis semilog plot. On the plot, the data points must be represented as diamond shaped symbols.

Answers

To plot [1, 10, 100, 1000, 10000] (along the x-axis) and (2,3,5,8, 13] (along the y-axis) as an x-axis semilog plot in MATLAB,

we can use the following command:```plot([1, 10, 100, 1000, 10000], [2,3,5,8, 13], 'd-'); set(gca,'XScale','log');``` This will plot the data points as diamond-shaped symbols and use a logarithmic scale on the x-axis. The 'd-' argument specifies that we want diamond-shaped markers and a solid line connecting them. The set() function is used to set the x-axis scale to logarithmic using the gca() function to get the current axes handle. Note that the semilog plot is commonly used for data that spans several orders of magnitude to make it easier to visualize trends in the data.

know more about MATLAB,

https://brainly.com/question/30763780

#SPJ11

MAPP gas, natural gas, propane, and acetylene can be used with oxygen to cut metal.
True
False

Answers

The answer is true.

How many 10" diameter circles can be cut from a semicircular shape that has a 20"
diameter and a flat-side length of 25"?

Answers

9514 1404 393

Answer:

  1

Explanation:

Only one such circle can be drawn. The diameter of the 10" circle will be a radius of the semicircle. In order for the 10" circle to be wholly contained, the flat side of the semicircle must be tangent to the 10" circle. There is only one position in the figure where that can happen. (see attached).

Answer:

1

The diameter measurement of a semi circle having a measure of 10" diameter , 20" diameter and a length of 25.

Consider the shift register below. Assume all FFs are initially set to O. What are the FF outputs after 4 clock pulses? QA-0, QB = 1, QC-1 QA 0, QB 0, QC-O QA-1, QB = 1, QC-0 QA-1, QB 1, QC-1

Answers

After 4 clock pulses, the FF outputs will be QA=1, QB=1, QC=0.

A shift register is a type of sequential logic circuit that can store and shift data. It consists of a series of flip-flops (FFs) connected in a chain, where each FF stores one bit of data.

In the given scenario, all FFs are initially set to 0. With each clock pulse, the data stored in the shift register moves one position to the right. The data that gets shifted out of the last FF is lost, and a new data bit is shifted into the first FF.

After 4 clock pulses, the data has shifted through the FFs. Let's track the changes:

- Initially, all FFs are set to 0.

- After the first clock pulse, the data bit enters the first FF, and all other FFs also shift to the right. The output of QA becomes 0 (shifted from the previous state), QB becomes 0 (shifted from QA's previous state), and QC becomes 0 (shifted from QB's previous state).

- After the second clock pulse, the data bit enters the first FF again, shifting the previous values further. The output of QA becomes 1 (new data bit), QB becomes 0 (shifted from QA's previous state), and QC becomes 0 (shifted from QB's previous state).

- After the third clock pulse, the pattern repeats. The output of QA becomes 1 (shifted from the previous state), QB becomes 1 (shifted from QA's previous state), and QC becomes 0 (shifted from QB's previous state).

- After the fourth clock pulse, the pattern continues to shift. The output of QA becomes 1 (shifted from the previous state), QB becomes 1 (shifted from QA's previous state), and QC becomes 0 (shifted from QB's previous state).

Therefore, after 4 clock pulses, the final state of the FF outputs will be QA = 1, QB = 1, and QC = 0.

This represents the data shifting through the shift register over the course of 4 clock pulses. Each FF output is the result of the previous FF's output being shifted to the right.

Learn more about outputs here:-

https://brainly.com/question/17405663
#SPJ11

A series LRC ac circuit has a peak voltage of 110 V and a peak current of 2.00 A. If the current lags the voltage by 35 degrees, what is the average power of the circuit?
A) 91 W
B) 78 W
C) 182 W
D) 156 W

Answers

The average power of the circuit is option A) 91 W.

To calculate the average power of the LRC AC circuit, we can use the formula:

Average Power = RMS Voltage × RMS Current × Power Factor

First, let's find the RMS (Root Mean Square) values of the voltage and current. The RMS value is equal to the peak value divided by the square root of 2:

RMS Voltage = Peak Voltage / √2

RMS Current = Peak Current / √2

Given:

Peak Voltage = 110 V

Peak Current = 2.00 A

RMS Voltage = 110 V / √2 ≈ 77.78 V

RMS Current = 2.00 A / √2 ≈ 1.41 A

Next, let's calculate the power factor. The power factor is the cosine of the phase angle between the voltage and current:

Power Factor = cos(θ)

Given:

Phase angle (θ) = 35 degrees

Power Factor = cos(35°) ≈ 0.819

Now, we can calculate the average power using the formula:

Average Power = RMS Voltage × RMS Current × Power Factor

Average Power = 77.78 V × 1.41 A × 0.819 ≈ 91 W

Therefore, the average power of the circuit is approximately 91 W.

Learn more about average power here:-

https://brainly.com/question/31040796
#SPJ11

9. Go to the Earnings Projections worksheet. Pranjali has entered most of the income and expense data on the worksheet. She knows the income from municipal grants will be $25,000 in 2022, and estimates it wil be $40,000 in 2026 . She needs to calculate the income from municipal grants in the years 2023-2025. The grants should increase at a constant amount from year to year. Project the income from Municipal grants for 2023-2025 (cels D5:F5) using a Linear Trend interpolation. Fil a ronge using interpolation. In the Eamings Projections worksheet, one or more cells in the range D5:F5 contains incorrect values.

Answers

The projected income from municipal grants for the years 2023-2025 using a linear trend interpolation is as follows:

2023: $28,750

2024: $32,500

2025: $36,250

Given that Income from municipal grants in 2022: $25,000

Income from municipal grants in 2026: $40,000

First, we need to find the constant amount of increase per year. We can calculate this by subtracting the initial value from the final value and dividing it by the number of years in between:

Constant increase = (Final value - Initial value) / (Number of years)

Constant increase = ($40,000 - $25,000) / (2026 - 2022)

= $15,000 / 4

= $3,750

Now we can project the income from municipal grants for the years 2023-2025 by adding the constant increase to the previous year's value.

For 2023:

Income from municipal grants = Income from municipal grants in 2022 + Constant increase

= $25,000 + $3,750

= $28,750

For 2024:

Income from municipal grants = Income from municipal grants in 2023 + Constant increase

= $28,750 + $3,750

= $32,500

For 2025:

Income from municipal grants = Income from municipal grants in 2024 + Constant increase

= $32,500 + $3,750

= $36,250

To learn more on Linear Interpolation click:

https://brainly.com/question/30766144

#SPJ12

write a function that returns the reverse of its simple list parameter.

Answers

In Python, it is easy to reverse a list using the reverse() method. However, to reverse a list using a function, we can use the slicing technique. Let's look at an example of how to reverse a simple list using a Python function. Example of a function that returns the reverse of its simple list parameter:```def reverse_list(lst): return lst[::-1]```

Definition: A list is a mutable data type, meaning it can be altered or modified. The elements in a list are ordered, and it allows for duplicate elements. A list is created by enclosing elements within square brackets[].

Slicing is a technique used to extract a particular set of values from an iterable, such as a list or a tuple. It is a type of operator that extracts part of a string, tuple, or list based on its index. Example of a function that returns the reverse of its simple list parameter:```def reverse_list(lst): return lst[::-1]``` Here, we are defining a function called reverse_list(), which takes in a list as a parameter. The function returns the reverse of the given list using the slicing technique. To reverse a list, we use the slicing technique with step size -1, which returns a new list with all the elements in reverse order.

The slicing technique is used to extract a portion of a list. In this case, lst[::-1] returns a new list with all the elements in reverse order. In other words, it extracts a portion of the list from the first element to the last element with a step of -1, which means it goes in reverse order. Here's an example of how to use this function:'''my_list = [1, 2, 3, 4, 5]print(reverse_list(my_list))```

Output:[5, 4, 3, 2, 1]. The output of the above example code shows the reverse order of the given list, which is [5, 4, 3, 2, 1]. The function has successfully reversed the list.

know more about reverse_list(),

https://brainly.com/question/23516428

#SPJ11

identify a common method for reducing project costs when time is not an issue.

Answers

In the project management field, project cost management is the process of controlling project costs.

Project managers aim to ensure that projects stay within budget by managing costs related to labor, resources, materials, and other expenses. However, when time is not a significant constraint, project managers can use various methods to reduce project costs. A common method is to lower expenses by choosing a less costly option for the project. Lowering expenses does not always mean that a company will have to settle for lower quality or less productive alternatives. Instead, it can mean selecting cost-effective options that save money without sacrificing the quality or effectiveness of the project. Project managers can achieve this by exploring multiple options for each project aspect and comparing costs and benefits.

Project managers can also consider adopting open-source software and platforms instead of paid or proprietary options. Open-source platforms and software can be a more cost-effective solution, as they are often free or require fewer expenses than their proprietary counterparts. Additionally, project managers can engage with vendors or suppliers to negotiate favorable pricing or payment options to cut down on expenses while maintaining quality and productivity. In conclusion, when time is not an issue, project managers can reduce project costs through multiple methods such as choosing cost-effective options, adopting open-source platforms, and negotiating with vendors or suppliers.

know more about project cost management

https://brainly.com/question/31217950

#SPJ11

create a scenario summary report showing result values for cells k6 k12 and k13 in the report

Answers

To create a scenario summary report showing result values for cells K6, K12, and K13 in the report, follow the steps below:

Step 1: First, select the cells (K6, K12, and K13) that you want to show in the scenario summary report.

Step 2: Click on the "What-If Analysis" option in the "Data" tab.

Step 3: Select the "Scenario Manager" option in the "What-If Analysis" menu.

Step 4: In the "Scenario Manager" window, click on the "Add" button to create a new scenario.

Step 5: In the "Add Scenario" window, enter a name for the scenario in the "Scenario Name" box.

Step 6: Select the cells that you want to change in the scenario by clicking on the "Changing cells" box and then selecting the cells in the worksheet. Click on the "OK" button.

Step 7: In the "Scenario Manager" window, select the scenario that you have just created and click on the "Show" button.

Step 8: In the "Scenario Values" window, enter the values that you want to use for the changing cells in the scenario. Click on the "OK" button.

Step 9: Click on the "Summary" button in the "Scenario Manager" window to create a scenario summary report that shows the result values for cells K6, K12, and K13 in the report.

You can customize the scenario summary report as needed by using the formatting options in Excel.

Learn more about scenario summary report here:

https://brainly.com/question/30692755

#SPJ11

Which of the following allowed third party mechanical devices to be attached directly on AT&T telephone sets?
a. The Kingsbury Agreement
b. Telecommunications Act of 1996
c. The Modified Final Judgment (MFJ)
d. Hush-a-Phone decision

Answers

The correct option is a. The Kingsbury Agreement.

The Kingsbury Agreement allowed third party mechanical devices to be attached directly on AT&T telephone sets. The Kingsbury Agreement is an agreement between the Bell System and the United States Department of Justice, under which the Bell System agreed to divest itself of its local exchange service operating companies. It was signed in 1982. AT&T had agreed to divest itself of its local exchange service operating companies as part of the settlement of an antitrust lawsuit against the company.The agreement also allowed for the manufacture of third-party devices that could be attached to AT&T telephone sets, providing a new market for companies that had previously been shut out of the telecommunications industry. This was a significant change, as AT&T had previously required customers to lease telephones from the company rather than purchase them outright. The Kingsbury Agreement opened up the market for telephone equipment and allowed for increased competition in the industry. In conclusion, the correct option is a. The Kingsbury Agreement.

Learn more about mechanical devices here,  

https://brainly.com/question/32328139

#SPJ11

I'm interested in knowing if there are two adjacent strings in a list that are very similar to each other. For instance, "Zach" and "Zack" are only one character apart.


Write a function, named "CloseEnough" that takes a const reference to a vector of strings and an int. The vector is a list of strings (each of the same length). The int represents how many characters can be different between any two strings next to each other. This function should return the index (an int) of the string that is within the second arguments distance to the next string in the vector. If no index fulfills this criteria, it should return -1

Answers

Here's a function called Close Enough which takes a const reference to a vector of strings and an int. This function is used to check if there are two adjacent strings in a list that are very similar to each other by determining the number of characters that can be different between any two strings next to each other.

The function starts by iterating through the vector of strings from the first to the second to last string. For each string, it then counts the number of differences between it and the next string by comparing the characters at each position.

If the number of differences is less than or equal to the given integer n, the function returns the index of the current string. If there is no such index, the function returns -1.

To know more about vector visit:

https://brainly.com/question/24256726

#SPJ11

Which of the following combinations of bends can be used in a conduit run?
A. One 90-degree, three 45-degree, and four 30-degree
B. TWO 90-degree, two 45-degree, and four 30-degree
C. Two 90-degree, four 45-degree, and one 30-degree
D. One 90-degree, six 45-degree, and one 30-degree

Answers

Answer:

Answer is A

Explanation:

Doesn't break 360 degrees of bend.

The bend that can be used in conduit run is one 90-degree, three 45-degree, and four 30-degree.

Bend that can be used in conduit run is equal or less than 360 degree.

One 90-degree, three 45-degree, and four 30-degree, the total sum is 345 degree.Two 90-degree, two 45-degree, and four 30-degree, the total sum is 390 degree.Two 90-degree, four 45-degree, and one 30-degree, the total sum is 390 degree.One 90-degree, six 45-degree, and one 30-degree, the total sum is 390 degree.

So, One 90-degree, three 45-degree, and four 30-degree is the bend that can be used in conduit run.

Learn more: brainly.com/question/21199524

Let us assume we have an array with values ranging from 0 to 150.
Which of the following statements is correct regarding the following code?
a. from sklearn.preprocessing import Binarizer
b. binarizer = Binarizer(threshold = 50).fit(array)
c. binarizer.transform(array)

Answers

The required correct answer is b. binarizer = Binarizer(threshold = 50).fit(array)

Explanation: Binarizer in sklearn.preprocessing is a transformation function used to convert numeric data into binary form. A threshold value is used to specify a cut-off point. This is a binary classification method in which values above the threshold are classified as 1 and values below the threshold are classified as 0.The statement below shows how binarizer works in this case:binarizer = Binarizer(threshold = 50).fit(array)Here, the threshold is set to 50, meaning that all values above 50 will be set to 1, while all values below 50 will be set to 0. The array is then fitted into the binarizer object.To transform the array into binary form, binarizer.transform(array) is called. In essence, this statement applies the binarizer function to the array object.

Learn more about array here https://brainly.in/question/13971324

#SPJ11

A thick steel slab ( 7800 kg/m3 , c 480 J/kg K, k 50 W/m K) is initially at 300 C and is cooled by water jets impinging on one of its surfaces. The temperature of the water is 25 C, and the jets maintain an extremely large, approximately uniform convection coefficient at the surface. Assuming that the surface is maintained at the temperature of the water throughout the cooling, how long will it take for the temperature to reach 50 C at a distance of 25 mm from the surface

Answers

Answer:

1791 secs  ≈ 29.85 minutes

Explanation:

( Initial temperature of slab )  T1 = 300° C

temperature of water ( Ts ) = 25°C

T2 ( final temp of slab ) = 50°C

distance between slab and water jet = 25 mm

Determine how long it will take to reach T2

First calculate the thermal diffusivity

∝  = 50 / ( 7800 * 480 ) = 1.34 * 10^-5 m^2/s

next express Temp as a function of time

T( 25 mm , t ) = 50°C

next calculate the time required for the slab to reach 50°C at a distance of 25mm

attached below is the remaining part of the detailed solution

Assume your website has these three pages: start.html, products.html, and blog.html. Create a with an to each page, with content: Home Products, and Contact us. SHOW EXPECTED 1 2 3 4 5 Homeca/a> 6 Products a/a> 7 Contact us 8 9 10 11 Check Try again Testing number of tags Yours X Testing number of tags in the tag Yours and expected differ. See highlights below, Yours Expected Further testing is suppressed until the above passes Your webpage Home Products Contact us Expected webpage Home Products Contact us

Answers

To create a navigation menu with links to each page, you can use HTML <a> tags within an unordered list <ul>.

Here's an example of how you can create the navigation menu:

<ul>

 <li><a href="start.html">Home</a></li>

 <li><a href="products.html">Products</a></li>

 <li><a href="blog.html">Contact us</a></li>

</ul>

Each <li> element represents a list item, and within it, the <a> tag is used to create a hyperlink. The href attribute specifies the URL of the corresponding page.

Please note that the provided code snippet is a sample implementation. Make sure to replace "start.html", "products.html", and "blog.html" with the actual file names or URLs of your webpages.

Once you add this code to your webpage, you should see a navigation menu with the links to the specified pages: "Home", "Products", and "Contact us".

Learn more about navigation here

https://brainly.com/question/30633995

#SPJ11

In Exercises 1-12, solve the recurrence relation subject to the basis step. B(1) = 5 B(n) = 3B(n - 1) for n greaterthanorequalto 2

Answers

The solution to the given recurrence relation subject to the basis step is B(n) = 5 x 3^(n-1) is the answer.

Solving the given recurrence relation B(1) = 5 B(n) = 3B(n - 1) for n greater than or equal to 2, subject to the basic step.

For the basis step, we are given B(1) = 5.

So, the first element of the sequence is 5.

Now, let's find the second element of the sequence B(2) using the given recurrence relation.

B(2) = 3B(1) = 3 x 5 = 15.

We know that B(1) = 5 and B(2) = 15.

Using the recurrence relation, we can find the next terms of the sequence as follows: B(3) = 3B(2) = 3 x 15 = 45B(4) = 3B(3) = 3 x 45 = 135B(5) = 3B(4) = 3 x 135 = 405 And so on.

We can see that each term of the sequence is three times the previous term.

So, the sequence is an exponential sequence of the form B(n) = a x 3^(n-1), where a is the first term of the sequence.

Based on the values of the first two terms, we have B(1) = 5 and B(2) = 15.

Using these values, we can find the value of 'a' as follows: 5 = a x 3^(1-1) => a = 5.

So, the sequence is given by the formula B(n) = 5 x 3^(n-1).

Therefore, the solution to the given recurrence relation subject to the basis step is B(n) = 5 x 3^(n-1).

know more about recurrence relation

https://brainly.com/question/30895268

#SPJ11

Given a 2-dimensional array with the following declaration:
int myArray[4][9];
How would you pointer arithmetic to calculate the position of the element myArray[3][2]?
Note, this is independent of the size of the array elements because C will offset based on the size of the array element. For example myArray+4 would be the position of the 5th element in the array (i.e., element myArray[1][0]).

Answers

To calculate the position of the element myArray[3][2] using pointer arithmetic, you can use the following formula:

[tex]*(myArray[0] + 3 * 9 + 2)[/tex]

In a 2-dimensional array in C, the elements are stored in contiguous memory locations row-wise. So, the number of rows (4 in this case) determines the stride of the array.

To calculate the position of myArray[3][2], we need to take into account the row stride and the column index. Here's the step-by-step explanation:

Since myArray is a 2-dimensional array, the expression myArray[0] represents the memory location of the first element in the first row.

To access the element myArray[3][2], we need to move 3 rows down and 2 columns to the right from the starting position.

Considering each row has 9 elements (as given in the declaration), we multiply the number of rows (3) by the number of columns (9) to determine the offset caused by moving 3 rows down. This gives us 3 * 9.

Finally, we add the column index (2) to the offset obtained in the previous step to account for the 2 columns we need to move to the right.

By dereferencing the calculated memory location using the * operator, we can access the value stored at myArray[3][2].

Putting it all together, the pointer arithmetic expression to calculate the position of myArray[3][2] would be [tex]*(myArray[0] + 3 * 9 + 2)[/tex]

To learn more about Array: https://brainly.com/question/28061186

#SPJ11

What are the technical specifications and graphic outline for Solar Panels/Systems?
Technical Specifications and Graphic Outlay – refers to contemporary requirements of material, design, product, or service by way of established technical standards with supporting sketches/schematic.

Answers

Solar panels/systems require several technical specifications and graphic outline. Below are the technical specifications and graphic outline for solar panels/systems:Technical Specifications for Solar Panels/Systems1. Wattage: This is the most common technical specification for solar panels, and it denotes the power rating of a solar panel. Wattage determines how much energy the solar panel can produce.

The wattage of a solar panel is measured in watts (W).2. Efficiency: The efficiency of a solar panel is the percentage of sunlight that the panel can convert into electricity. The higher the efficiency, the more energy a panel can produce. Efficiency is measured as a percentage.3. Voltage: The voltage of a solar panel is the electrical potential difference between two points on the panel. It is measured in volts (V).4. Current: The current of a solar panel is the flow of electricity through the panel. It is measured in amperes (A).5. Temperature coefficient: The temperature coefficient of a solar panel is the rate at which its power output decreases as the temperature increases.Graphic Outline for Solar Panels/Systems1. Roof type: The graphic outline for solar panels/systems requires an accurate depiction of the roof type where the panels will be installed. This includes identifying the pitch, direction, and slope of the roof.2. Panel layout: This refers to the arrangement of the solar panels on the roof. The graphic outline should include the number of panels, their size, and orientation.3. Electrical layout: The electrical layout depicts how the solar panels will be connected to the electrical system of the building. This includes wiring diagrams, junction boxes, and inverters.4. Structural details: Structural details depict how the solar panels will be mounted on the roof. This includes the type of mounting system used, the materials used, and the weight distribution of the panels.5. Shading analysis: The shading analysis shows any obstacles that may block the sunlight from reaching the solar panels. It also shows the impact of shadows on the output of the solar panels.In conclusion, the technical specifications and graphic outline for solar panels/systems are critical in ensuring that solar panels are installed correctly and safely. The technical specifications ensure that the solar panels produce the required amount of energy while the graphic outline ensures that the panels are installed in the right place and in the right way.

To know more about Solar Panels/Systems visit:

https://brainly.com/question/14117766

#SPJ11

Which color is used to indicate that a wire will be energized when power is brought to the circuit
A. Yellow
B. Black
C. Blue
D. White

Answers

Answer:

I think the answer is B. Black

A valid call to the following method using a params parameter is:
public static void DoSomething(params int[ ] item)
a. DoSomething(4);
b. DoSomething(anArray);
c. DoSomething(4, 5, 6);
d. a and c are correct
e. all are correct

Answers

The correct answer is d. A and c are correct. The method signature indicates that we can call the method with a variable number of parameters.

The method can receive one or more integers, so options a and c are both correct options. Here's a more detailed explanation of each

option: a. Do Something(4); This is a valid call to the DoSomething method. The method is called with a single integer parameter, 4.b. DoSomething(anArray); This is not a valid call to the DoSomething method. The parameter is an array, but the method expects a variable number of integers. c. DoSomething (4, 5, 6); This is a valid call to the DoSomething method. The method is called with three integer parameters: 4, 5, and 6.d. a and c are correct. This is the correct option. Both a and c are valid calls to the DoSomething method. e. All are correct. This option is not correct because option b is not a valid call to the DoSomething method.

know more about method signature

https://brainly.com/question/32386529

#SPJ11

The reason why the sign-magnitude method for representing signed numbers is not used in most computers can readily be illustrated by performing the following. a) Represent + 12 in eight bits using the sign-magnitude form. b) Represent - 12 in eight bits using the sign-magnitude form. c) Add the two binary numbers and note that the sum does not look anything like zero.

Answers

The sum of the two binary numbers is not zero, which is why the sign-magnitude method for representing signed numbers is not used in most computers.

The sign-magnitude method for representing signed numbers is not used in most computers because of its limitation. The sign-magnitude representation for numbers has a few limitations, which is why it is not used in most computers. One of the biggest drawbacks is that it requires two representations for zero, which makes arithmetic operations difficult. When performing arithmetic operations on numbers represented using the sign-magnitude method, we must first examine the signs of the operands to determine the operation to perform. We'll look at the steps to represent +12 in eight bits using the sign-magnitude form and represent -12 in eight bits using the sign-magnitude form. Finally, we'll add the two binary numbers and note that the sum does not look like zero.To represent +12 in eight bits using the sign-magnitude form, follow the below steps:Step 1: Convert the absolute value of 12 into binary form.1100 is the binary representation of 12.Step 2: Since the number is positive, the leftmost bit must be 0. As a result, the final binary representation is 01100.01100 is the sign-magnitude representation of +12.To represent -12 in eight bits using the sign-magnitude form, follow the below steps:Step 1: Convert the absolute value of 12 into binary form.1100 is the binary representation of 12.Step 2: Since the number is negative, the leftmost bit must be 1. As a result, the final binary representation is 11100.11100 is the sign-magnitude representation of -12.Adding the two binary numbers gives:01100+11100=101000As we can see, the sum of the two binary numbers is not zero, which is why the sign-magnitude method for representing signed numbers is not used in most computers.

Learn more about binary numbers here:

https://brainly.com/question/28222245

#SPJ11

The incident at the Dixie Cold Storage Company demonstrates that the ________ hazard of ammonia is not always fully understood. water reactivity toxicity flammability instability

Answers

The incident at the Dixie Cold Storage Company demonstrates that the water reactivity hazard of ammonia is not always fully understood.

What is water reactivity hazard?

Water-reactive substances are chemicals that spontaneously react with water or damp air to produce hydrogen gas or other flammable gases. They may ignite or explode if exposed to moisture, water, or humid air. For instance, alkali metals, such as sodium and potassium, are highly reactive with water and can spontaneously ignite when exposed to even a small amount of water. It should be noted that ammonia (NH3) is one such water-reactive substance. Water-reactive substances, such as ammonia, can pose significant health and safety risks if not properly handled and managed.

The ammonia gas is exceptionally toxic and may cause burns or other injuries to the eyes, skin, and respiratory tract. Ammonia inhalation may cause serious respiratory problems or even death. Therefore, it is critical to have appropriate protection when dealing with ammonia to prevent accidental injury or illness. The incident at the Dixie Cold Storage Company demonstrates that the water reactivity hazard of ammonia is not always fully understood. Water-reactive substances are chemicals that spontaneously react with water or damp air to produce hydrogen gas or other flammable gases.

Learn more about Cold Storage:

https://brainly.com/question/29887072

#SPJ11

Other Questions
What is the geologic difference between shale, sandstone, and conglomerate? Explain these rocks to me Which country is bordered by both Ecuador and Venezuela HELPPP ME PLSSS AND NO BOTS BC I WILL REPORT AND I BARELY HAVE POINT SO PLS HELP ME In an examination, 40% students passed in Maths only, 30% passed in Science only and 10%students failed in both the subjects. If 400 students passed in Science, find the total number ofstudents by drawing a Venn diagram.help me Write a letter to your friend telling him three reasons why u like your school An economist conducted a study of the possible association between weekly income and weekly grocery expenditures. The particular interest was whether higher income would cause shoppers to spend more en groceries. A random sample of shoppers at a local supermarket was obtained. A questionnaire was administered asking about the weekly income of each shopper's family and their grocery bill for that werk. The gender of each shopper was also obtained. The data below are expenditures and income for 10 selected survey participants. Income Grocery 98 52 201 78 298 108 398 95 481 198 600 99 738 162 805 187 890 105 1023 173 The correlation for these data is given by 0.794 Ob-0.619. 0.649 4.0.735. 1. How were the 1950s a breath of fresh air for most white Americans?2. What was the cause of the Summer of Violence in the 1960s?3. What was the outcome of the Voting Rights Act of 1965?4. What was the result of Freedom Summer? In your opinion was this movement a success?5. Why was the march in Selma a success? Use a calculator to evaluate the function at the indicated values. Round your answers to three decimals. h(x)=e3x;h(13),h(1.5),h(1),h()h(x)=e3x;h(31),h(1.5),h(1),h() Genuine Goods has two stores: East and West. During May, Genuine reported a net operating income of $50,000 and sales of $540,000. The contribution margin in Store East was $100,000, or 40% of sales. The segment margin in Store West was $45,000, or 15% of sales. Traceable fixed expenses are $60,000 in Store East, and $40,000 in Store West. Genuine's total fixed expenses for the year were i light is faster then anything how did dark get there first hello there enjoy 30 points on da house 4Select the correct answer.Solve the following equation for x.x2 - 9x+ 18 = 0O A.X = -3; x = 6.X= 3; x = 6OC.x= -3; x = -6OD.x= 3; x = -6(ResetNext Question 9 of 10Which of the following statements are true of nuclear energy and reactors?Check all that apply.O A. Nuclear reactors on Earth use fusion reactions to produce energy.B. Nuclear fission reactions use only a small amount of material toproduce a large amount of energy.C. Nuclear reactors use controlled reactions.D. Nuclear fission is done by joining nuclei together into a biggernucleus. knapp development's trial balance shows $103,000 face value of bonds with a discount balance of $1,500. the bonds mature in 10 years. how will the bonds be presented on the balance sheet? What is the mean:4,3,5,4,8,0 IXL What is the simple interest earned on an $4,350 investment for 5 years at a rate of 2%? 200% of what number is 350? After the War of 1812, the War Hawks took over leadership of the Republican Party. Which positions did the War Hawks favor?ill mark brainlyest A rod of length 30.0 cm has linear density (mass per length) given by=50.0+20.0 xwhere x is the distance from one end, measured in meters, and is in grams/ meter.What is the mass of the rod? Development does not only refer to economic development, butalso to human development. Define the Human Development Index(HDI), and then briefly explain what it measures with regards todevelopment. The concentration of active ingredient in a liquid laundry detergent is thought to be affected by the type of catalyst used in the process. The standard deviation of active concentration is known to be 3 grams per liter regardless of the catalyst type. Ten observations on concentration are taken with each catalyst, and the data follow: Catalyst 1: 57.9, 66.2, 65.4, 65.4, 65.2, 62.6, 67.6, 63.7, 67.2, 71.0 Catalyst 2: 66.4, 71.7, 70.3, 69.3, 64.8, 69.6, 68.6, 69.4, 65.3, 68.8. a. Find a 95% confidence interval on the difference in mean active concentrations for the two catalysts. Find the P-value. b. Is there any evidence to indicate that the mean active concentrations depend on the choice of catalyst? Base your answer on the results of part (a).c. Suppose that the true mean difference in active concentration is 5 grams per liter. What is the power of the test to detect this difference if = 0.05? d. If this difference of 5 grams per liter is really important, do you consider the sample sizes used by the experimenter to be adequate? Does the assumption of normality seem reasonable for both samples?