College
Wings Co. budgeted $570,000 manufacturing direct wages, 3,000 direct labor hours, and had the following manufacturing overhead: Overhead Cost Budgeted Budgeted Level for Overhead Pool Overhead Cost Driver Cost Driver CostMaterials handling $188,000 4,700 pounds Weight of materials Machine setup 21,600 540 setups Number of setups Machine repair 1,260 31,500 machine hours Machine hours Inspections 12,400 310 inspections Number of inspections Requirements for Job 971 which manufactured 4 units of product: Direct labor 20 hours Direct materials 130 pounds Machine setup 30 setupsMachine hours $15.000 machine hoursInspections 15 inspections 1. Using ABC, overhead cost assigned to Job #971 for machine setup is:____.a. $2,300.b. $990.c. $6,500.d. $690.e. $1,020 .2. Using ABC, overhead cost assigned to Job #971 for machine repair is:____. a. $2,300.b. $990.c. $6,500.d. $690.e. $1,020.